Cloud-Native Architecture

Move core workloads to cloud without stopping operations

We migrate in planned waves, keep a rollback point at every step and decommission what you no longer need.

Waves in a typical migration plan
6
Stages from assessment to decommission
4
Rollback point at every wave
1

Most migrations stall on three problems

  • System sprawl

    Hundreds of applications with dependencies nobody has documented.

  • Rising run cost

    Legacy compute and licences growing faster than the business.

  • Migration risk

    Past moves that stalled, overran or caused outages.

How we work

Four stages, each with an exit point

  1. Stage 1

    Assess

    Map every application, dependency and data flow.

  2. Stage 2

    Design

    Set the target architecture and the wave plan.

  3. Stage 3

    Migrate

    Move in waves, with a tested rollback for each.

  4. Stage 4

    Decommission

    Retire legacy systems and bank the savings.

Questions leaders ask

How do you avoid downtime during migration?

Each wave runs in parallel with the system it replaces. We cut over only after the new service passes agreed checks, and the old one stays ready to take traffic back until the wave is signed off.

Which workloads should stay on-premises?

Some should. Latency, data residency and licence terms can all make on-premises the right answer. The readiness audit shows which of your workloads fall into that group and why.

Which cloud platforms do you work with?

We work across the major public clouds and private cloud. We recommend a platform after the assessment, based on your estate, your team's skills and your commercial agreements.

Who runs the platform after go-live?

Your team, us, or both. We hand over runbooks and train your engineers, and we can stay on as a co-engineering team while they take ownership.